Refine
Document Type
- Conference Proceeding (9)
- Part of a Book (3)
- Book (1)
Language
- English (13) (remove)
Is part of the Bibliography
- no (13)
Keywords
- Big Data (1)
- BigPro (1)
- Cyber physical production control (1)
- Data Analytics (1)
- Data analytics (1)
- Datenmodell (1)
- Decision support (1)
- Design of Experiments (1)
- Digital Supply Chain (1)
- Digitaler Schatten (3)
Institute
In today´s turbulent market, the way data are used in production is one of the key aspects to maintain or increase a manufacturing company´s ability to compete. Even though most companies are aware of the advantages of collecting, analyzing and using data, the majority of them do not exploit these fully. Thus, IT systems and sensors are integrated into the shop floor in order to deal with the current challenges, leading to an overwhelming amount of data without contributing to an improvement of production control. Because of developments like digitization and Industry 4.0, there is an innumerable amount of existing research focusing on data analytics, artificial intelligence and pattern recognition. However, research on collaborative platforms in traditional production control still needs improvement. Therefore, the main goal of this paper is to present a platform based closed loop production control and to discuss the relevant data. The collaborative platform represents the basis for a future analysis of high-resolution data using cognitive systems in order for companies to maximize the automation of their production. A use case at the end of the paper shows the potential implementation of the findings in practice.
Industry 4.0 and the consequent necessity of digitalization has also impli-cations to the field of procurement, resulting in the so-called term of Procurement 4.0. Digitalization can be a valuable tool to increase the efficiency of the procurement organization and to exploit new opportunities of growth. A mandatory requirement to perform the digital transformation is an increased transparency along the procurement process chain. This paper aims to conceptualize a digital shadow for the procurement process in manufacturing industry as a basis for advanced data analytics procedures. The term digital shadow stands for a sufficiently accurate, digital image of a compa-ny's processes, information and data. This image is needed to create a real-time eval-uable basis of all relevant data in order to finally derive recommendations for action. The formation of the Digital Shadow is thus a central field of action for Industrie 4.0 and forms the basis for all further activities.
Today, manufacturing companies are facing the influences of a dynamic environment and the continuously increasing planning complexity. Using advanced data analytics methods, processes can be improved by analyzing historical data, detecting patterns and deriving measures to counteract the issues. The basis of such approaches builds a virtual representation of a product – called the digital twin or digital shadow.
Although, applied IT systems provide reliable feedback data of the processes on the shop-floor, they lack on a data structure which represents real-time data series of a product. This paper presents an approach for a data structure for the order processing which overcomes the described issue and provides a virtual representation of a product. Based on the data structure deviations between the production schedule and the real situation on the shop-floor can be identified in real time and measures to reschedule operations can be identified.
Real-time data analytics methods are key elements to overcome the currently rigid planning and improve manufacturing processes by analysing historical data, detecting patterns and deriving measures to counteract the issues.
The key element to improve, assist and optimize the process flow builds a virtual representation of a product on the shop-floor - called the digital twin or digital shadow. Using the collected data requires a high data quality, therefore measures to verify the correctness of the data are needed. Based on the described issues the paper presents a real-time reference architecture for the order processing.
This reference architecture consists of different layers and integrates real-time data from different sources as well as measures to improve the data quality. Based on this reference architecture, deviations between plan data and feedback data can be measured in real-time and countermeasures to reschedule operations can be applied.
Production in high-wage countries can be made more efficient, cost-effective, and flexible by solving the conflict between planning and value orientation. A promising approach is to focus on planning and decision-making processes (production planning and control, design of production processes and machinery, etc.) and to aim to maximize overall planning efficiency. Planning efficiency can be expressed as the ratio between the benefit generated by preparing detailed process instructions to produce the parts or components and the corresponding planning efforts. Industrial companies wanting to gain a competitive advantage in dynamic global markets have to identify a set of non-dominated solutions with the most favorable effort–benefit ratio rather than a single solution. The optimum between detailed planning and the immediate implementation of value-adding activities (process steps) in the process chain needs to be found dynamically for each product.
Influenced by the high dynamic of the markets and the steadily increasing demand for short delivery times the importance of supply chain optimization is growing. In particular, the order process plays a central role in achieving short delivery times and constantly needs to evaluate the trade-off between high inventory and the risk of stock-outs. However, analyzing different order strategies and the influence of various production parameters is difficult to achieve in industrial practice. Therefore, simulations of supply chains are used in order to improve processes in the whole value chain. The objective of this research is to evaluate two different order strategies (t, q, t, S) in a four-stage supply chain. In order to measure the performance of the supply chain the quantity of the backlog will be considered. A Design of Experiments approach is supposed to enhance the significance of the simulation results.
This research area focuses on the management systems and principles of a production system. It aims at controlling the complex interplay of heterogeneous processes in a highly dynamic environment, with special focus on individualized products in high-wage countries. The project addresses the comprehensive application of self-optimizing principles on all levels of the value chain. This implies the integration of self-optimizing control loops on cell level, with those addressing the production planning and control as well as supply chain and quality management aspects. A specific focus is on the consideration of human decisions during the production process. To establish socio-technical control loops, it is necessary to understand how human decisions are made in diffuse working processes as well as how cognitive and affective abilities form the human factor within production processes.
Influenced by the high dynamic of the markets the optimization of supply chains gains more importance. However, analyzing different procurement strategies and the influence of various production parameters is difficult to achieve in industrial practice. Therefore, simulations of supply chains are used in order to improve the production process. The objective of this research is to evaluate different procurement strategies in a four-stage supply chain. Besides, this research aims to identify main influencing factors on the supply chain’s performance. The performance of the supply chain is measured by means of back orders (backlog). A scenario analysis of different customer demands and a Design of Experiments analysis enhance the significance of the simulation results.
Industrie 4.0 is all around us today: in politics, in the media, and on the agendas of researchers and entrepreneurs. Smarter, faster, more personalized, more efficient, more integrated – those are just some of the promises of this new industrial era. The potential, especially for Germany ́s mechanical
engineering industry and plant engineering sector, is indeed great, both for providers and for users of technologies across the spectrum of Industrie 4.0.
But there are still many unresolved questions, uncertainties, and challenges. Our readiness study seeks to address this need and offer insight. Because Industrie 4.0 will not happen on its own.
This study is intended to bring the grand vision closer to the business reality. We also highlight the challenging milestones that many companies must still pass on the road to Industrie 4.0 readiness.
The study examines where companies in the fields of mechanical and plant engineering currently stand, focusing on what motivates them and what holds them back, and on the differences that emerge between small and medium enterprises on the one hand and large enterprises on the other.
The results make it possible for the first time to develop a detailed, systematic picture of Industrie 4.0 readiness in the engineering sector.
The study concludes with recommendations for action in the business community, complementing the diverse suite of programs and activities offered by VDMA’s Forum Industrie 4.0. We would like to take this opportunity to thank the two sponsors of this project from the VDMA Forum, Dietmar Goericke and Dr. Christian Mosch, whose efforts played a critical role in making this study a success.
We are convinced that Industrie 4.0 can become a success story for Germany’s engineering sector. May our “Industrie 4.0 Readiness” study do its part in this effort.
One major problem of today’s producing companies is to reach a high adherence to delivery dates while considering the volatile market situation as well as economic aspects. This problem can only be solved by using a production control that is optimally adapted to the processes. A good working, process-oriented production control is essential for being able to control the production situation and to ensure a high adherence to delivery dates. Data generation and processing determine the success of production control. Current processes and IT systems have several shortcomings in meeting these challenges.
The solution for this problem is the so called “cyber physical production control” (CPPC). It optimally supports the production scheduler in his decision making process based on real-time high-resolution data. With the help of data analytics, the production controller receives decision support over various steps. Due to CPPC, the overall goal of a high adherence to delivery dates can be fundamentally increased.