Produktionsmanagement
Refine
Year of publication
- 2017 (9) (remove)
Document Type
- Conference Proceeding (9) (remove)
Is part of the Bibliography
- no (9)
Keywords
- BigPro (1)
- Change Request (1)
- Design of Experiments (1)
- Digitaler Schatten (1)
- Echtzeit (1)
- Industrie 4.0 (2)
- Internet of Production (1)
- Production management (1)
- Produktentwicklung (1)
- Real-Time Data (1)
Institute
With big data-technologies on the rise, new fields of application appear in terms of analyzing data to find new relationships for improving process under-standing and stability. Manufacturing companies oftentimes cope with a high number of deviations but struggle to solve them with less effort. The research project BigPro aims to develop a methodology for implementing counter measures to disturbances and deviations derived from big data. This paper proposes a methodology for practitioners to assess predefined counter measures. It consists of a morphology with several criterions that can have a certain characteristic. Those are then combined with a weighting factor to assess the feasibility of the counter measure for prioritization.
Manufacturing companies are facing an increasingly turbulent market – a market defined by products growing in complexity and shrinking product life cycles. This leads to a boost in planning complexity accompanied by higher error sensitivity. In practice, IT systems and sensors integrated into the shop floor in the context of Industry 4.0 are used to deal with these challenges. However, while existing research provides solutions in the field of pattern recognition or recommended actions, a combination of the two approaches is neglected. This leads to an overwhelming amount of data without contributing to an improvement of processes. To address this problem, this study presents a new platform-based concept to collect and analyze the high-resolution data with the use of self-learning algorithms. Herby, patterns can be identified and reproduced, allowing an exact prediction of the future system behavior. Artificial intelligence maximizes the automation of the reduction and compensation of disruptive factors.
Influenced by the high dynamic of the markets the optimization of supply chains gains more importance. However, analyzing different procurement strategies and the influence of various production parameters is difficult to achieve in industrial practice. Therefore, simulations of supply chains are used in order to improve the production process. The objective of this research is to evaluate different procurement strategies in a four-stage supply chain. Besides, this research aims to identify main influencing factors on the supply chain’s performance. The performance of the supply chain is measured by means of back orders (backlog). A scenario analysis of different customer demands and a Design of Experiments analysis enhance the significance of the simulation results.
The topics Internet of Things and Industry 4.0 increasingly lead to the fact that the customer is increasingly focused on manufacturing companies. He wants to know delivery date of the product, wants to make changes at short notice, get an individualized product and much more. Technologically, these requirements have already been met, but the structures within the company as well as the operational processes are not yet or only partially prepared to cope with the increasing complexity and dynamics of production. This leads to many deviations with which the production controller must deal, whether they are complex or trivial.
In order to counteract the increasing number and frequency of deviation situations which are currently encountered with complex manual interventions, it is necessary to systematically evaluate deviations and then to allocate them a dominant reaction strategy (manual, partially automated, automated) from which a suitable reaction measure can be derived. This relieves the production controller, since assistance systems partially eliminate deviations independently.
As a result, the production controller gets more time to deal with the cause of deviations so that a new occurrence of deviations can be avoided and the number of deviations can be reduced sustainably. The following paper provides a solution for the assessment of deviations. In addition, it includes differentiation logic to allocate one of the three different reaction strategies to the identified deviation.
Nowadays one of the most challenging tasks of producing companies is the growing complexity due to the globalization and digitalization. Especially in high wage countries, the ability to deliver fast and to a fixed date gets more and more important. To achieve this logistic target, it is necessary to optimize the Production Planning and Control (hereinafter PPC). This study investigates the effects of a change of the scheduling parameters on a target system. The focused research questions are: How can the effect of a scheduling parametersvariation on the target system of the PPC can be displayed efficiently? Is it possible to review the effect of the scheduling parameters-variation quantitatively and to derive action options?
Die Verschärfung des Wettbewerbsumfelds produzierender Unternehmen und die als Antwort hierauf in den Fokus rückenden agilen Methoden vergrößern die Bedeutung einer effizienten Handhabung von Änderungsprozessen. Am Beispiel des Maschinen- und Anlagenbauers Ortlinghaus zeigt der Beitrag, dass eine Kombination aus ungeeigneten Änderungsprozessen und mangelhaftem IT-Support in der Praxis oft die schnelle und gleichzeitig qualitätsgesicherte Durchführung von Änderungsprozessen verhindert. Der Zielkonflikt aus geringem Zeitbedarf und hoher Prozessqualität lässt sich durch Anpassungen in der IT-Unterstützung reduzieren. Hierdurch können Erfolgsfaktoren für ein effizientes Änderungsmanagement gehoben und die Problemfelder der Workflowunterstützung, Informationsverteilung und Datenhandhabung verbessert werden. Zentrales Hindernis zur Adressierung der Erfolgsfaktoren stellt die aktuell zur Abwicklung von Change Requests genutzte Arbeitsumgebung dar. Der Beitrag präsentiert hierfür als zentralen Lösungsansatz die Internet of Production Infrastruktur. Das Potenzial der Internet of Production Infrastruktur im Kontext des Änderungsmanagements wird anhand von drei Anwendungsbeispielen verdeutlicht. Abschließend wird der Migrationspfad für Unternehmen bei der Einführung eines effizienten Änderungsmanagements aufgezeigt.
Real-time data analytics methods are key elements to overcome the currently rigid planning and improve manufacturing processes by analysing historical data, detecting patterns and deriving measures to counteract the issues.
The key element to improve, assist and optimize the process flow builds a virtual representation of a product on the shop-floor - called the digital twin or digital shadow. Using the collected data requires a high data quality, therefore measures to verify the correctness of the data are needed. Based on the described issues the paper presents a real-time reference architecture for the order processing.
This reference architecture consists of different layers and integrates real-time data from different sources as well as measures to improve the data quality. Based on this reference architecture, deviations between plan data and feedback data can be measured in real-time and countermeasures to reschedule operations can be applied.
Working capital management is one of the key disciplines that must be prudently monitored for a firm in pursuit of profits, liquidity and growth. The focus of this paper is on the engineer-to-order manufacturers, and the objective is to analyze the correlations between the reference processes of the engineer-to-order production approach with the key postulates of working-capital management and deliver a mathematical operating curves model, whose purpose and goal is basing on the rationale, that is underlying in the parent logistic operating curves theory. [https://link.springer.com/chapter/10.1007/978-3-319-66926-7_30]
Influenced by the high dynamic of the markets and the steadily increasing demand for short delivery times the importance of supply chain optimization is growing. In particular, the order process plays a central role in achieving short delivery times and constantly needs to evaluate the trade-off between high inventory and the risk of stock-outs. However, analyzing different order strategies and the influence of various production parameters is difficult to achieve in industrial practice. Therefore, simulations of supply chains are used in order to improve processes in the whole value chain. The objective of this research is to evaluate two different order strategies (t, q, t, S) in a four-stage supply chain. In order to measure the performance of the supply chain the quantity of the backlog will be considered. A Design of Experiments approach is supposed to enhance the significance of the simulation results.