Produktionsmanagement
Refine
Document Type
- Conference Proceeding (3)
- Part of a Book (1)
Is part of the Bibliography
- no (4)
Keywords
- Production Control (4) (remove)
Institute
Changing customer demands lead to increasing product varieties and decreasing delivery times, which in turn pose great challenges for production companies. Combined with high market volatility, they lead to increasingly complex and diverse production processes. Thus, the susceptibility to disruptions in manufacturing rises, turning the task of Production Planning and Control (PPC) into a complex, dynamic and multidimensional problem. Addressing PPC challenges such as disruption management in an efficient and timely manner requires a high level of manual human intervention. In times of digitization and Industry 4.0, companies strive to find ways to guide their workers in this process of disruption management or automate it to eliminate human intervention altogether. This paper presents one possible application of Machine Learning (ML) in disruption management on a real-life use case in mixed model continuous production, specifically in the final assembly. The aim is to ensure high-quality online decision support for PPC tasks. This paper will therefore discuss the use of ML to anticipate production disruptions, solutions to efficiently highlight and convey the relevant information, as well as the generation of possible reaction strategies. Additionally, the necessary preparatory work and fundamentals are covered in the discussion, providing guidelines for production companies towards consistent and efficient disruption management.
Towards the Generation of Setup Matrices from Route Sheets and Feedback Data with Data Analytics
(2018)
The function or department of production control in manufacturing companies deals with short-term scheduling of orders and the management of deviations during order execution. Depending on the equipment and characteristics of orders, sequence dependent setup times might occur. In these cases for companies that focus on high utilization of their assets due to long phases of ramp up and high energy costs, it might be optimal to choose sequences with minimal setup time times between orders. Identifying such sequences requires detailed and correct information regarding the specific setup times. With increasing product variety and shorter lot sizes, it becomes more difficult and rather time intense to determine these values manually. One approach is to analyse the relevant features of the orders described in the route sheets or recipes to find similarities in materials and required tools. This paper presents a methodology, which supports setup optimized sequencing for sequence dependent setup times through constructing the setup matrix from such route sheets with the use of data analytics.
The shop floor is a dynamic environment, where disturbances to the production plan occur. While there are many tools to support production planning, production control is left unsupported in handling disruptions.The aim of the Cluster of Excellence is to develop an application to support the production controller in his decision process to identify and evaluate the right countermeasures. In this abstract, we present the concept for the application.
S. 133
In manufacturing, adherence to delivery dates is one of the main logistic goals. The production control department has to cope with short-term deviations from the planned route sheets. Because of unforeseen disruptions, e.g. machine breakdowns or shortage of material or personnel, in some situations, the promised delivery date to the customer is at stake. In practice, a fast and reasonable decision on how to deal with the delayed order is required. This decision process is often based on a qualitative analysis relying on the planner’s subjective assessment of a complex situation. To improve the quality of possible countermeasures this paper presents an application, which supports the decision process through a quantified analysis using real-time data from business application systems in combination with a simulation of the value stream. The developed app is part of the decision process and estimates the effect of selected countermeasures to accelerate a delayed order. Performance indicators illustrate the effect of the countermeasures on the specific order as well as the whole system. This approach empowers the planner to assess unforeseen situations and aims to improve the quality of the decision-making process. This paper describes the architecture of the application, its simulation ecosystem, the relevant data and the decision process to select the most effective countermeasures.