Refine
Document Type
Language
- English (3) (remove)
Is part of the Bibliography
- no (3)
Keywords
- Energiemanagement (3) (remove)
Institute
Due to the drastically increasing amount of data, decision making in companies heavily relies on having the right data available. Also because of an increasing complexity of structures and processes, quick and precise flows of information become more important.
This paper introduces a new approach for modelling information flows, creating a basis for an efficient information management. It can be used to structure the information requirements and identify gaps within the information processing.
To display its benefits, the proposed Information Logistics Notation (ILN) is applied to the information logistics of todays and future energy market and grid stability management, both processes of increasing complexity.
In order to introduce load management in the manufacturing industry, some obstacles need to be pointed out. This paper presents a feasible approach on how to implement load management measures in companies.
To this end, load management and energy management are explained and distinguished in a first step. Subsequently, the implementation method is introduced. Therefore, by means of this paper, companies will be enabled to use load management measures and significantly reduce their energy costs. In the second part of the paper, the introduced approach will be applied.
Hence, a use case of a manufacturing company is described. Alongside energy analyses with consumption data, specific measures are presented.
In order to introduce load management in the manufacturing industry, some obstacles need to be pointed out. This paper presents a feasible approach on how to implement load management measures in companies. To do so, load management and energy management are explained and distinguished in a first step. Subsequently, the implementation method is introduced. Therefore, by using this paper, companies will be enabled to use load management measure and reduce their energy costs significantly.