Refine
Year of publication
- 2014 (2) (remove)
Document Type
Is part of the Bibliography
- no (2)
Keywords
- Simulation (2) (remove)
Institute
Increasing productivity in product-service systems is a vital success factor for industrialized economies and individual businesses. The service production is typically described as an integrated value chain setting, in which the provider and the customer are co-creators.
This paper embraces a characteristic curve model in order to illustrate the influence of the customer on the productivity of service production. The characteristic curves are derived from a system dynamics simulation model for a synchronized takt-based service production. In conclusion this research leads to designs recommendations for service production systems in order to reduce lead times and increase adherence to delivery dates.
Steigende Energiekosten sind ein zunehmendes Risiko für Unternehmen des deutschen Maschinen- und Anlagenbaus. Die Steigerung der Energieeffizienz kann somit zukünftig zu Wettbewerbsvorteilen führen. Aufgrund der Komplexität heutiger Produktionssysteme ist eine Analyse der Wechselwirkungen von Parametern der Produktionsplanung und -steuerung (PPS) auf die Energieeffizienz notwendig, um Maßnahmen zu identifizieren, die eine Steigerung der Energieeffizienz ermöglichen.
Der vorliegende Artikel stellt die Ergebnisse einer Simulationsstudie vor, in welcher der Einfluss der Losgrößenplanung auf die Energieeffizienz im Rahmen einer mehrstufigen Mehrproduktfertigung untersucht wird. Die Ergebnisse der Studie leisten einen Beitrag zum besseren Verständnis der komplexen Zusammenhänge und können als Ausgangspunkt für weitere Untersuchungen zu Wechselwirkungen von Produktionsparametern mit der Energieeffizienz dienen.