Refine
Document Type
Language
- English (2) (remove)
Is part of the Bibliography
- no (2)
Keywords
- Production Control (2) (remove)
Institute
Changing customer demands lead to increasing product varieties and decreasing delivery times, which in turn pose great challenges for production companies. Combined with high market volatility, they lead to increasingly complex and diverse production processes. Thus, the susceptibility to disruptions in manufacturing rises, turning the task of Production Planning and Control (PPC) into a complex, dynamic and multidimensional problem. Addressing PPC challenges such as disruption management in an efficient and timely manner requires a high level of manual human intervention. In times of digitization and Industry 4.0, companies strive to find ways to guide their workers in this process of disruption management or automate it to eliminate human intervention altogether. This paper presents one possible application of Machine Learning (ML) in disruption management on a real-life use case in mixed model continuous production, specifically in the final assembly. The aim is to ensure high-quality online decision support for PPC tasks. This paper will therefore discuss the use of ML to anticipate production disruptions, solutions to efficiently highlight and convey the relevant information, as well as the generation of possible reaction strategies. Additionally, the necessary preparatory work and fundamentals are covered in the discussion, providing guidelines for production companies towards consistent and efficient disruption management.
Towards the Generation of Setup Matrices from Route Sheets and Feedback Data with Data Analytics
(2018)
The function or department of production control in manufacturing companies deals with short-term scheduling of orders and the management of deviations during order execution. Depending on the equipment and characteristics of orders, sequence dependent setup times might occur. In these cases for companies that focus on high utilization of their assets due to long phases of ramp up and high energy costs, it might be optimal to choose sequences with minimal setup time times between orders. Identifying such sequences requires detailed and correct information regarding the specific setup times. With increasing product variety and shorter lot sizes, it becomes more difficult and rather time intense to determine these values manually. One approach is to analyse the relevant features of the orders described in the route sheets or recipes to find similarities in materials and required tools. This paper presents a methodology, which supports setup optimized sequencing for sequence dependent setup times through constructing the setup matrix from such route sheets with the use of data analytics.